News / Actual  

The 54th Meeting of the Study Group for Route Charges

Modernization of Gyumri “TOWER” equipment

Implementation of On-Line Data Interchange (OLDI)

Upgrade of EVN and GYU P3D WAM systems

TO THE CENTENNIAL MEMORIAL OF THE ARMENIAN GENOCIDE

“ARMATS” CJSC COMPLIES WITH INTERNATIONAL AVIATION STANDARDS

TECHNICAL MODERNIZATION OF ATC CENTRE

EAD Regional Workshop 2013

A noteworthy illustrated book- album

First in Eastern Europe

Article «Controllers of the skies – as the guardians of safety» and Interview of the Director General Mr. E. Musoyan to Respublika Armenia newspaper 03.05.2010

Interview of the Development & Policy Director Mr. E. Pilosyan to ARKA news agency
Exclusive interview of the director of development and corporate policy of "ARMATS" CJSC Eduard Pilosyan to information agency "ARKA" ...

Modernization of DVOR/DME in the airport of Gyumri
In September 2009 in airport “Shirak” a new equipment of “Thales” company has been implemented (has been put into operation), which owing to its larger capacity enables to provide the DVOR/DME operation both in aerodrome zone and en-route.

Integration into CRCO 
The Republic of Armenia is a member state of EUROCONTROL and a Party of Multilateral Agreement regarding Route Charges. Since March 1, 2009 the RA technically has been integrated in the Route Charging System and the planning of the costs and the charges of en-route expenses carries out in cooperation with the Central Route Charges Office (CRCO) of EUROCONTROL.

“Modernization of  VHF communication network, with 8.33 kHz channel spacing”
Since 2008 the VHF radio stations providing ATC communication channels have been fully modernized. The equipment produced by “Park Air Systems” is mainly used here. At the same time, this year the modernization process of primary multiplexers and radio relay communication with implementation of digital microwave radio relay stations CFM-7-LM and CFQ-7-LM produced by “SAF Technika AS” will be completed.

Safety Culture Assessment
In 2008 a project on “Safety Culture Assessment” was initiated with the support of EUROCONTROL. At the first stage of that project the current situation was analyzed by means of special procedures, particular critical directions were detected and corresponding recommendations were worked out.
In 2009 the second stage of the project began, during which the development and realization of arrangements began to improve the situation.

 

Copyrigth 2010 ARMATS